Located in three distinct areas – Azrak, Mafrak and Madaba – the 106 farms were furnished with 20kWp systems under a grant to the farmers from the EU. The scope of work included permitting, engineering, procurement and installation of the PV systems. The most notable challenge was the limited time frame available for installation, and the complexity of designing a fit-for-all mounting structure and foundations for the various sites that are widespread. The contract includes responsibility for the maintenance of the PV systems over a period of three years.