Mustakbal clean tech was responsible for the design, procurement, construction and testing of this 2.3 MWp PV system. The scope was to design and build the PV plant in the Madaba area under a wheeling scheme. The system comprised of Jinko polycrystalline modules, German fixed tilt mounting structure, SMA string inverters, MV transformers and switching stations in accordance with JEPCO’s requirements. The plant is monitored using a Gantner system, as well as a CCTV and parameter detection system.