Automotive Group Company Project, 2013


 

Location: Amman, Jordan
Status: Complete
Application: 25kWp

 
This project was among the first large grid connected projects on JEPCO’s network pursuant to the Electricity Regulatory Commission’s regulations for net metering. The 101 module system comprised of Trina modules and SMA tri-power inverters, and provided a saving of some 20-30% of the customer’s electricity bill, and a payback period of six years. The system incorporated the Tigo Optimizers allowing for module level monitoring and troubleshooting.


1MWp PV Project at King Hussein University – Women’s Residential Complex


 

Location: Maan Development Area
Status: Complete
Application: 2 x 503kWp PV project

 
Mustakbal was contracted by MDA to implement a 1MWp grid-connected ground mounted system at Maan Development Company’s student housing buildings at the King Hussein bin Tala Univesrity. The contract was signed in October 2013, grid permit approval was received on 28 of November 2014, and the project was commissioned on 4 April, 2014, less than 130 days from permit approval. 255W Trina panels are used together with SMA tri-power string inverters.


Ahliyah School for Gils


 

Location: Amman
Status: Complete, Summer 2013
Application: 60kWp system

 
Mustakbal designed and installed the 60kWp plant for Al Ahlieyh School for Girls . The total installed capacity is divided between two roofs, at 20kWp and 40kWp. 250W Trina mount panels and SMA inverters are being used.


International Community School


 

Location: Amman
Status: Complete, Fall 2013
Application: 60kWp system

 
Mustakbal commissioned the PV system system for the ICS school in November, 2013. The 60kWp system is comprised of 250W Trina panels with a Trina mount system, as well as SMA inverters.


Central Trade and Auto Company


 

Location: Amman
Status: Complete
Application: 70kWp system

 
Mustakbal implemented a 70 kWp system to be installed in Mecca Street for the showrooms of Toyota and Lexus. The project was completed in September 2013.


Tower Trading Company


 

Location: Amman
Status: Complete
Application: 427kWp

 
Mustakbal designed and installed a 427kWp project on top of a warehouse building in Amman utilizing Trina Solar modules and ABB/PowerOne string inverters. The system was mounted on a corrugated steel warehouse.


Nader Group Warehouse


 

Location: Qastal
Status: Complete
Application: 226kWp

 
Mustakbal has designed and installed a 226kWp system that is supporting the electricity load of the warehousing facilities at Nader Group. The system is designed to provide 100% of the facility’s electricity requirements, and has utilized Trina Solar modules as well as SMA inverters.


Amman Academy


 

Location: Amman
Status: Complete
Application: 420kWp

 
As part of a formal tender process, Mustakbal designed and built this 420kWp PV system for the Amman Academy in Amman. Among the key challenges was the complex roof and the time schedule accommodating the school’s Calender of activities.
The system is comprised of SunPower 327W modules, and a custom mounting structure. SMA inverts were used, and a performance guarantee was provided to the client. The system was successfully tested and commissioned in December 2014.